General Motors LLC in Pontiac, Michigan received $568 million in federal grants from fiscal 2021 to 2025, across 10 awards. Its largest program was Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications, with $500 million. In fiscal 2025 it was awarded $500 million.

From USAspending.gov award records, updated November 7, 2026.

By year

Federal grants to General Motors LLC by fiscal year
Fiscal yearAwardsAmount
FY 20211-$1.3 million
FY 20222$12.3 million
FY 20235$18.8 million
FY 20243$38.9 million
FY 20251$500 million

An award funded in several years counts in each of them, so yearly awards add up to more than the five-year total.

Programs that fund General Motors LLC

Every program, fiscal 2021 to 2025
ProgramAwardsAmount
Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications 81.2531$500 million
Renewable Energy Research and Development 81.0875$61.1 million
Conservation Research and Development 81.0864$7.4 million

Awarding agencies

AgencyAwardsAmount
Department of Energy10$568 million

Largest awards

The 10 largest awards by money obligated in fiscal 2021 to 2025
AwardProgramFirst actionAmount
Inflation reduction act (IRA) electric vehicle (EV) conversion the recipient will convert an existing vehicle assembly facility located in the united states to electric vehicle (EV) production. The conversion will enable expansion of domestic ev production, components, and materials.
ASST_NON_DEMS0000084_089 on USAspending
Manufacturing and Energy Supply Chain Demonstrations and Commercial ApplicationsNovember 26, 2024$500 million
High speed fuel cell stack manufacturing the project objective is to design, build, and deploy a manufacturing system to produce 20,000 next generation fuel stacks/year. The manufacturing line will consist of anode and cathode electrode processing, unitized electrode assembly (UEA), stacking, compre
ASST_NON_DEEE0011340_089 on USAspending
Renewable Energy Research and DevelopmentSeptember 25, 2024$30.0 million
New award to general motors, LLC. Award number#: DE-EE0009859. Project title: freight emissions reduction via medium duty battery electric and hydrogen fuel cell trucks with green hydrogen production via a new electrolyzer design and electrical utility grid coupling.
ASST_NON_DEEE0009859_089 on USAspending
Renewable Energy Research and DevelopmentJuly 15, 2022$22.1 million
The purpose of the project is to develop 400-KILOWATT 800 v-class galium-nitride (GAN) enabled integrated electric drive systems with the target system efficiency of greater than 96% and power density of greater than 33 kw/l at a cost/kilowatt target of less than $6 suitable for the light and medium
ASST_NON_DEEE0010596_089 on USAspending
Conservation Research and DevelopmentSeptember 25, 2023$7.5 million
The project goal is to meet doe membrane and electrode performance and durability heavy-duty (HD) fuel cell targets [end of life (EOL) of 2.5 kw/gpgm after 25,000 heqv with =0.30 mgpgm/CM2 total loading] by developing novel membrane-electrode assemblies (MEAS) with thin (sub-nm to sub-Μm thick) sele
ASST_NON_DEEE0011106_089 on USAspending
Renewable Energy Research and DevelopmentFebruary 14, 2024$4.1 million
Ultra conducting composites (UCC) for advanced electric motors: the purpose of this project is to to develop and scale up the innovative high performance ultra-conducting copper/cnt composite (UCC) tapes capable of >10% reduction in resistance, >10% increase in ampacity, and >10% improvement in stre
ASST_NON_DEEE0010600_089 on USAspending
Conservation Research and DevelopmentSeptember 25, 2023$3.8 million
Surface protected high activity pt alloy catalysts for durable heavy duty fuel cells develop highly stable catalyst materials and catalyst-ionomer interfaces followed by integration in to a low-pgm loaded fuel cell membrane electrode assembly (MEA) to demonstrate its low cost (=0.30 mgpgm-total/CM2)
ASST_NON_DEEE0010749_089 on USAspending
Renewable Energy Research and DevelopmentSeptember 18, 2023$3.0 million
Novel organosulfur-based electrolytes for safe operation of high voltage li-ion batteries over a wide operating temperature DE-EE0009644 new award to general motors
ASST_NON_DEEE0009644_089 on USAspending
Conservation Research and DevelopmentSeptember 22, 2021$2.5 million
A. Project objectives the project goal is to develop a bipolar plate (BPP) manufacturing solution to achieve the doe 2030 bpp cost, performance, and durability target for heavy duty applications through fundamental investigation in phase 1 (budget period 1), and technology integration and demonstrat
ASST_NON_DEEE0009616_089 on USAspending
Renewable Energy Research and DevelopmentDecember 15, 2021$2.0 million
High conductive multilayer plate conductor used in electrified vehicles
ASST_NON_DEEE0011019_089 on USAspending
Conservation Research and DevelopmentSeptember 28, 2023$299,984

Amounts are net obligations: money committed, minus any amounts taken back. They are not payments. See how our data works.

Questions people ask

How much federal grant money does General Motors LLC get?

$568 million in 10 grant awards from fiscal 2021 to 2025, as obligations reported to USAspending.gov.

Which agency gives General Motors LLC the most?

The Department of Energy, with $568 million in 10 awards.

What is General Motors LLC's largest federal grant?

$500 million under Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications, with its first action in the period on November 26, 2024. That counts only the money obligated in fiscal 2021 to 2025.

Which federal programs fund General Motors LLC?

Its largest are Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications, Renewable Energy Research and Development and Conservation Research and Development.