DE-FOA-0002745: Bipartisan Infrastructure Law (BIL) Solar and Wind Grid Services and Reliability Demonstration
Closed
This grant is closed. A newer notice from the same program is open now: Accelerating Scale-up and Pre-piloting of Emerging Chemical Technologies (ASPECT) (DE-FOA-0003647). Status: Closes December 1, 2026 (24 days left). It is in our archive of Golden Field Office notices from 2022.
Golden Field Office offered grants of up to $5.6 million (at least $2.3 million) to any type of organization. It expected to make about 9 awards worth $26.0 million in total. Applications closed on November 17, 2022.
From the official notice on Grants.gov, last changed October 4, 2022. Checked November 7, 2026.
- Award ceiling$5.6 million
- Award floor$2.3 million
- Total funding$26.0 million
- Expected awards9
- Cost sharingRequired
- Funding typeCooperative Agreement
Key dates
| Posted | August 2, 2022 |
|---|---|
| Deadline | November 17, 2022 |
| Archived by Grants.gov | December 17, 2022 |
Who can apply
This opportunity was open to any type of organization.
- Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled "Additional Information on Eligibility"
Is this a realistic fit?
- Past Renewable Energy Research and Development awards averaged $2.8 million; this notice allows up to $5.6 million per award.
- Most of the program's money (30% over five years) went to colleges and universities.
- The notice requires cost sharing or matching funds, so you must contribute part of the project cost.
What the grant funds
This Modification (000002) includes:- Extended the Concept Paper Submission Deadline from 9/1/2022 to 9/15/2022. This action extends all other following deadlines. Modification 000001 includes:- A broken link that was fixed in Section I.A.vi - Teaming Partner List. Bipartisan Infrastructure Law (BIL) Solar and Wind Grid Services and Reliability DemonstrationThe Systems Integration Solar and Wind Grid Services and Reliability Demonstration FOA will provide funding to demonstrate the capability of large-scale solar and wind plants to provide grid services to the bulk power grid as well as improving grid reliability. Topic 1: Wind and Solar Grid Services Design, Implementation, and DemonstrationThis topic area supports full-scale demonstration projects that seamlessly integrate renewable generation with other large-scale or aggregated distributed energy resource (DER) technologies to provide ancillary (grid) services and improve reliability. Topic 2: Protection of Bulk Power Systems with High Contribution from Inverter-Based ResourcesThe goal of this topic area is to develop a better understanding of how protection systems will operate under very-high IBR scenarios through advancements in modeling and simulation capabilities and to develop and validate strategies and new technologies that can maintain system protection at any level of IBR penetration and improve reliability. Please find the full FOA at https://eere-exchange.energy.gov/
Who has won Renewable Energy Research and Development grants before
From fiscal 2021 to 2025, Renewable Energy Research and Development (81.087) awarded $2.5 billion across 900 grant awards, an average of $2.8 million per award.
| Recipient | State | Awards | Amount |
|---|---|---|---|
| Oregon State University | Oregon | 12 | $112 million |
| University of Utah | Utah | 3 | $107 million |
| Avapco LLC | Georgia | 2 | $103 million |
| Plug Power Inc. | New York | 4 | $75.7 million |
| General Motors LLC | Michigan | 5 | $61.1 million |
Applying now
This notice no longer takes applications. Apply under the newer notice, DE-FOA-0003647, which is open now.
The notice on Grants.gov keeps its full text and attachments, which is useful for planning a resubmission.
Questions people ask
Is DE-FOA-0002745 still open?
No. It closed on November 17, 2022. A newer notice is open: DE-FOA-0003647, closes December 1, 2026 (24 days left).
Who can apply for Bipartisan Infrastructure Law (BIL) Solar and Wind Grid Services and Reliability Demonstration?
Golden Field Office accepted applications from any type of organization.
What is the deadline for Bipartisan Infrastructure Law (BIL) Solar and Wind Grid Services and Reliability Demonstration?
Closed November 17, 2022. Applications are no longer accepted; the program's newer notices are on this page when there are any.
How much funding is available?
Awards of up to $5.6 million each. About $26.0 million in total across about 9 awards.
Who has won Renewable Energy Research and Development grants before?
The largest recipients over five fiscal years were Oregon State University, University of Utah, Avapco LLC. The program made 900 awards worth $2.5 billion in that time.
Similar open grants
- Affordable Rural Cooperative (ARC) Energy Program
- Advanced Nuclear Energy Licensing Cost-Share Grant Program
- Accelerating Scale-up and Pre-piloting of Emerging Chemical Technologies (ASPECT)
- Strengthening Moldova’s Energy and Trade Security
- Silcon Carbide Cladding Lead Test Rod Development-Phase 1
- Southeast New England Program (SNEP) Innovative Restoration Grants