DE-FOA-0003294: Bipartisan Infrastructure Law (BIL) Advanced Energy Manufacturing and Recycling Grant Program Section 40209
Closed
This grant is closed. Who won this program's grants before is below, and similar open grants are at the end of the page. It is in our archive of National Energy Technology Laboratory notices from 2024.
National Energy Technology Laboratory offered grants of up to $100 million (at least $1) to the applicants described in the notice. It expected to make about 25 awards worth $425 million in total. Applications closed on July 1, 2024.
From the official notice on Grants.gov, last changed June 13, 2024. Checked November 7, 2026.
- Award ceiling$100 million
- Award floor$1
- Total funding$425 million
- Expected awards25
- Cost sharingRequired
- Funding typeCooperative Agreement
Key dates
| Posted | March 8, 2024 |
|---|---|
| Deadline | July 1, 2024 |
| Archived by Grants.gov | July 31, 2024 |
Who can apply
This opportunity was open to the applicants described in the notice.
- Others (see text field entitled "Additional Information on Eligibility" for clarification)
Refer to Section III of the FOA
Is this a realistic fit?
- Past Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications awards averaged $59.2 million; this notice allows up to $100 million per award.
- Most of the program's money (80% over five years) went to businesses.
- The notice requires cost sharing or matching funds, so you must contribute part of the project cost.
What the grant funds
Bipartisan Infrastructure Law (BIL) Funding Opportunity Announcement (FOA) DE-FOA-0003294: BIL - Advanced Energy Manufacturing and Recycling Grant Program (Section 40209) through the Office of Manufacturing and Energy Supply Chains (MESC) Modification 000003 - The purpose of this modification is to: (1) update Section III.A.iv. to clarify eligible Prime Recipients and Subrecipients; update the Content Requirements Chart in Section IV.D. and information in Section IV.D.iii. to define a page limit for the Community Benefits Plan. The BIL invests appropriations over Fiscal Years (FYs) 2022 through 2026 to establish the Advanced Energy Projects Grant Program, which will support industrial projects in eligible energy communities. Through the two (2) Areas of Interest (AOI), the FOA will provide approximately $425 million in support of projects by small- and medium-sized manufacturing firms (SMMs) AOI 1: Clean Energy Manufacturing and Recycling: The objective of AOI 1 is to increase domestic manufacturing and recycling capacity for materials, components, and systems needed for the clean energy transition. DOE is seeking applications for projects in this AOI to establish new, or re-quip or expand, an existing manufacturing or recycling facility for the production or recycling, as applicable, of advanced energy property. AOI 2: Industrial Decarbonization: The overall objectives for AOI 2 is to reduce Greenhouse Gas (GHG) emissions in the United States manufacturing sector through substantial reductions in existing facilities and new builds that result in low carbon materials. Subtopic AOI 2a: Re-equip an existing industrial or manufacturing facility with equipment designed to substantially reduce the GHG emissions of that facility. Subtopic AOI 2b: Establish new, or re-equip or expand, an existing manufacturing or recycling facility that produces materials that result in substantially lower carbon intensity compared to an appropriate industry benchmark and are not derived from a primary feedstock of palm fatty acid distillates or fossil fuels including coal, natural gas, and petroleum.
Who has won Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications grants before
From fiscal 2021 to 2025, Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications (81.253) awarded $6.9 billion across 116 grant awards, an average of $59.2 million per award.
| Recipient | State | Awards | Amount |
|---|---|---|---|
| Fca Us LLC | Michigan | 2 | $585 million |
| General Motors LLC | Michigan | 1 | $500 million |
| Ascend Elements, Inc. | Massachusetts | 1 | $316 million |
| Mercedes-Benz Vans, LLC | South Carolina | 1 | $285 million |
| Albemarle U.S., Inc. | North Carolina | 2 | $217 million |
Applying now
This notice no longer takes applications. Agencies often post the same opportunity again under a new number, so check the program's notices on Grants.gov and the similar open grants below.
The notice on Grants.gov keeps its full text and attachments, which is useful for planning a resubmission.
Questions people ask
Is DE-FOA-0003294 still open?
No. It closed on July 1, 2024.
Who can apply for Bipartisan Infrastructure Law (BIL) Advanced Energy Manufacturing and Recycling Grant Program Section 40209?
National Energy Technology Laboratory accepted applications from the applicants described in the notice. The notice adds further conditions, so read its eligibility section.
What is the deadline for Bipartisan Infrastructure Law (BIL) Advanced Energy Manufacturing and Recycling Grant Program Section 40209?
Closed July 1, 2024. Applications are no longer accepted; the program's newer notices are on this page when there are any.
How much funding is available?
Awards of up to $100 million each. About $425 million in total across about 25 awards.
Who has won Manufacturing and Energy Supply Chain Demonstrations and Commercial Applications grants before?
The largest recipients over five fiscal years were Fca Us LLC, General Motors LLC, Ascend Elements, Inc. The program made 116 awards worth $6.9 billion in that time.
Similar open grants
- Affordable Rural Cooperative (ARC) Energy Program
- Accelerating Scale-up and Pre-piloting of Emerging Chemical Technologies (ASPECT)
- Strengthening Moldova’s Energy and Trade Security
- NOI: PROSPECT Program: Providing Opportunities for Specialized Education in Critical Technologies
- Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED)
- Notice of Intent to Issue NOFO DE-FOA-0003649: Leveraging Domestic Infrastructure and Resources to Unleash Alternative Chemicals, Fuels and Feedstocks