W81EWF-22-SOI-0033: Effects of Sediment Release from Water Injection Dredging on Downstream Freshwater Ecology in Kansas
Closed
This grant is closed. A newer notice from the same program is open now: ERDC Broad Agency Announcement (W912HZ26S0001). Status: Closes January 1, 2027 (55 days left). It is in our archive of Engineer Research and Development Center notices from 2022.
Engineer Research and Development Center offered grants of up to $77,000 to the applicants described in the notice. It expected to make one award worth $183,000 in total. Applications closed on August 18, 2022.
From the official notice on Grants.gov, last changed June 23, 2022. Checked November 7, 2026.
- Award ceiling$77,000
- Total funding$183,000
- Expected awards1
- Cost sharingNot required
- Funding typeCooperative Agreement
Key dates
| Posted | June 23, 2022 |
|---|---|
| Deadline | August 18, 2022 |
| Archived by Grants.gov | September 17, 2022 |
Who can apply
This opportunity was open to the applicants described in the notice.
- Others (see text field entitled "Additional Information on Eligibility" for clarification)
This opportunity is restricted to non-federal partners of the Great Plains Cooperative Ecosystems Studies Unit (CESU).
Is this a realistic fit?
- Past Basic, Applied, and Advanced Research in Science and Engineering awards averaged $1.1 million; this notice allows up to $77,000 per award.
- Most of the program's money (69% over five years) went to colleges and universities.
- No cost sharing or match is required.
What the grant funds
The construction of dams interrupts the continuity of sediment transportation through river basins, resulting in problems such as, decreased reservoir storage, flood risk management, and navigation capacity. As of 2012, loss of water storage capacity from sedimentation in 20 large federal reservoirs in Kansas ranged from 2% to 43% (see Juracek 2015; The Aging of America's Reservoirs: In-Reservoir and Downstream Physical Changes and Habitat Implications). Downstream habitat changes also result from sediment deprivation (e.g., channel incision, changes in bedform, loss of lateral connectivity, unnaturally clear water). Sediment management actions at aging reservoirs (e.g., hydro injection dredging, flushing, hydrosuction) may drive ecological effects in downstream river systems (e.g., changes in biodiversity, water quality, habitat quality) that are not well-known. Research is needed to understand and document the potential effects of releasing sediment from reservoirs to downstream ecosystems. The USACE Kansas City District (NWK) is conducting a Water Injection Dredging (WID) pilot project at Tuttle Creek Lake, Kansas that will potentially begin as soon as Summer 2023.This will be the first time Water Injection Dredging has been conducted in a reservoir anywhere in the world. Water Injection Dredging uses water jets designed to disaggregate, hydraulically lift, and entrain bed material into a density current. Factors such as, settling velocity, bed slope, bed roughness, relative densities of sediment and water column, and total jet water discharge influence the distance over which a density current will be transported. Ideally, sediment is transported in the density currents to reservoir outlets and sediment is passed to downstream the ecosystem in order to restore reservoir pool capacities. The main objective of the WID pilot project is to test, collect, analyze and document data related to the WID technology. Environmental data will be collected inside the reservoir and downstream to evaluate the potential effects of moving the sediment inside the reservoir and changing the sediment regime downstream of the reservoir. The data collected will help future feasibility studies at Tuttle Creek Lake, and will also be used to validate empirical or numerical models and other tools that could be used to assess WID at other lakes.
Who has won Basic, Applied, and Advanced Research in Science and Engineering grants before
From fiscal 2021 to 2025, Basic, Applied, and Advanced Research in Science and Engineering (12.630) awarded $1.3 billion across 1,101 grant awards, an average of $1.1 million per award.
| Recipient | State | Awards | Amount |
|---|---|---|---|
| Battelle Memorial Institute | Ohio | 1 | $82.6 million |
| Msi Stem Research & Development Consortium | District of Columbia | 1 | $78.2 million |
| University of California San Diego | California | 4 | $53.1 million |
| Sikorsky Aircraft Corporation | Connecticut | 4 | $38.1 million |
| The Trustees of the University of Pennsylvania | Pennsylvania | 3 | $35.0 million |
Applying now
This notice no longer takes applications. Apply under the newer notice, W912HZ26S0001, which is open now.
The notice on Grants.gov keeps its full text and attachments, which is useful for planning a resubmission.
Questions people ask
Is W81EWF-22-SOI-0033 still open?
No. It closed on August 18, 2022. A newer notice is open: W912HZ26S0001, closes January 1, 2027 (55 days left).
Who can apply for Effects of Sediment Release from Water Injection Dredging on Downstream Freshwater Ecology in Kansas?
Engineer Research and Development Center accepted applications from the applicants described in the notice. The notice adds further conditions, so read its eligibility section.
What is the deadline for Effects of Sediment Release from Water Injection Dredging on Downstream Freshwater Ecology in Kansas?
Closed August 18, 2022. Applications are no longer accepted; the program's newer notices are on this page when there are any.
How much funding is available?
Awards of up to $77,000 each. About $183,000 in total for one award.
Who has won Basic, Applied, and Advanced Research in Science and Engineering grants before?
The largest recipients over five fiscal years were Battelle Memorial Institute, Msi Stem Research & Development Consortium, University of California San Diego. The program made 1,101 awards worth $1.3 billion in that time.