Closed Closed May 20, 2026 Opportunity DE-FOA-0003580

This grant is closed. Who won this program's grants before is below, and similar open grants are at the end of the page. It is in our archive of National Energy Technology Laboratory notices from 2026.

National Energy Technology Laboratory offered grants of up to $250 million (at least $1) to the applicants described in the notice. It expected to make $1.9 billion in total. Applications closed on May 20, 2026.

From the official notice on Grants.gov, last changed April 2, 2026. Checked November 7, 2026.

Key dates

PostedMarch 12, 2026
DeadlineMay 20, 2026
Archived by Grants.govJuly 31, 2026

Who can apply

This opportunity was open to the applicants described in the notice.

See Section II.A of the Notice of Funding Opportunity for a full description of the eligibility requirements.

Is this a realistic fit?

What the grant funds

Modification 000001: Issued to change the Informational Webinar posting date; modified NOFO Part 1, Section II.A.2 - Participant Limitations to clarify that Tennessee Valley Authority is eligible to apply as a subrecipient under all Topic Areas; Section III.F. - Topic Area 1:Grid Resilience (IIJA Section 40101(c)) to clarify the wording around applications that are not of interest; and Section IV.C - Concept Paper to delete the sentence "Each concept paper must be limited to a single concept, technology, or project." Please see the NOFO for a full description of the modification. SPARK is an opportunity to meet load demand growth and resource adequacy, and to address critical national, interregional, and regional needs. OE achieves these goals by stimulating investment in power system infrastructure and building partnerships between states, local governments, tribes, and power system operators to enhance reliability and affordability of the electric grid. Projects submitted under this NOFO must demonstrate measurable improvements in electric grid capacity and system value (usefulness), combining physical capacity gains, which include solutions such as reconductoring or other infrastructure upgrades with operational efficiency and/or flexibility from other Advanced Transmission Technologies (ATTs). Applications must show how these complementary technologies expand transfer capability, strengthen reliability and resource adequacy, and reduce consumer cost impact while utilizing existing rights of way. DOE will prioritize projects that can be implemented quickly to deliver durable physical upgrades and dynamic operational gains that together increase the value, performance, security, resilience, affordability, and reliability of the nation’s electric grid.

Category: Energy.

Who has won Grid Infrastructure Deployment and Resilience grants before

From fiscal 2021 to 2025, Grid Infrastructure Deployment and Resilience (81.254) awarded $9.9 billion across 465 grant awards, an average of $21.3 million per award.

Largest recipients, fiscal 2021 to 2025
RecipientStateAwardsAmount
Department of Commerce MontanaMontana2$747 million
State of California Energy CommissionCalifornia2$737 million
Department of Commerce MinnesotaMinnesota2$483 million
Massachusetts Department of Energy ResourcesMassachusetts2$432 million
Puerto Rico Electric Power AuthorityPuerto Rico1$365 million

Top states: California ($1.1 billion), Montana ($775 million), Minnesota ($656 million), Massachusetts ($575 million), Georgia ($533 million).

Applying now

This notice no longer takes applications. Agencies often post the same opportunity again under a new number, so check the program's notices on Grants.gov and the similar open grants below.

The notice on Grants.gov keeps its full text and attachments, which is useful for planning a resubmission.

Questions people ask

Is DE-FOA-0003580 still open?

No. It closed on May 20, 2026.

Who can apply for Infrastructure Investment and Jobs Act (IIJA) — Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK)?

National Energy Technology Laboratory accepted applications from the applicants described in the notice. The notice adds further conditions, so read its eligibility section.

What is the deadline for Infrastructure Investment and Jobs Act (IIJA) — Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK)?

Closed May 20, 2026. Applications are no longer accepted; the program's newer notices are on this page when there are any.

How much funding is available?

Awards of up to $250 million each. About $1.9 billion in total.

Who has won Grid Infrastructure Deployment and Resilience grants before?

The largest recipients over five fiscal years were Department of Commerce Montana, State of California Energy Commission, Department of Commerce Minnesota. The program made 465 awards worth $9.9 billion in that time.

Similar open grants